AD

Adil Doshayev

Global Supply @Tesla | MBA | PMP
Request removal
Email: ****v@tesla.com
LinkedIn: Adil Doshayev
Location: Palo Alto, California, United States
Current employer: Tesla
Current title:
Global Supply Manager, Capital Equipment Purchasing
Last updated: 22/05/2023 01:49 AM
Get valid emails for Adil and 500M other professionals
20 free emails each month. No credit card required.
500M
Business Profiles
20M
Company Profiles
200M
Email addresses
98%+
Email Delivery
About

Adil Doshayev is from Palo Alto, California, United States. Adil works in the following industries: "Logistics and Supply Chain". Adil is currently Global Supply Manager, Capital Equipment Purchasing at Tesla, located in Fremont, California, United States. In Adil's previous role as a Operations Consultant at Wood, Adil worked in Houston, Texas until Sep 2020. Prior to joining Wood, Adil was a Project Engineer at Eni and held the position of Project Engineer. Prior to that, Adil was a Project Operations Engineer at Eni, based in London, United Kingdom from Jul 2015 to Aug 2016. Adil started working as Project Engineer at Eni in Nur-Sultan, Kazakhstan in Apr 2011. From Sep 2005 to Feb 2011, Adil was Field Operations Engineer at Karachaganak Petroleum Operating B.V., based in Karachaganak Field, Aksai, Kazakhstan.

Adil Doshayev's contact information is available for free on finalscout.com, a web-based professional networking database with more than 500 million business contacts and 200 million company profiles.

Adil Doshayev's current jobs
Company: Tesla
Title: Global Supply Manager, Capital Equipment Purchasing
Period: May 2021 - Present (3 years, 6 months)
Location: Fremont, California, United States

Purchasing manufacturing equipment for battery packs. Purchasing manufacturing equipment for drive units Purchased components for intelligent humanoid robot - Optimus project. Purchasing cathode quality lab equipment

Adil Doshayev's past jobs
Company: Wood
Title: Operations Consultant
Period: Aug 2018 - Sep 2020 (2 years, 1 month)
Location: Houston, Texas

Operations project management for BP Argus platform Mad Dog 2 project. Consulting for asset acquisition in the US GoM. Operating Expenditures (OPEX) for upstream and downstream projects. Shell Brunei Champion 7 and Total Tyra East platforms upgrade projects. BP TT Galeotta oil terminal, BP TT Cassia C platform, Equinor Peregrino platform projects.

Company: Eni
Title: Project Engineer
Period: Aug 2016 - Aug 2017 (1 year)

Project Management: Controlled company $ 1 billion capital projects portfolio for Karachaganak joint venture environment that includes the following development projects in the Oil and Gas Industry: Gas Debottlenecking, Gas Injection Upgrade, 5th Trunkline, 4th Gas Injection Compressor, Karachaganak Expansion Project. Negotiation: Negotiated Long-term Gas Sales Agreement contract with Gazprom that avoided a loss of $400 million per year.

Company: Eni
Title: Project Operations Engineer
Period: Jul 2015 - Aug 2016 (1 year, 1 month)
Location: London, United Kingdom

Developed operations deliverables and interface for $10 billion Karachaganak Expansion program, during Concept Selection and pre-FEED phases; Stakeholder Management: Coordinated interfaces between the project management team and field operations. Estimated project OPEX.

Company: Eni
Title: Project Engineer
Period: Apr 2011 - Jul 2015 (4 years, 3 months)
Location: Nur-Sultan, Kazakhstan

Engaged with JV partners on project framing and value assurance reviews for Karachaganak project. Project Control: Budgeted capital expenditures and reduced project costs. Optimized proposed project schedules. Execution / Construction: Managed social projects construction ($3 millions) for Kashagan project. Contract Management: Supervised 3 subcontracting companies, Enhanced scope of work for tender, Supported bid technical evaluation, Obtained permits and licenses for Gas Plant, Power Plant, Shipyard, Refinery projects.

Company: Karachaganak Petroleum Operating B.V.
Title: Field Operations Engineer
Period: Sep 2005 - Feb 2011 (5 years, 5 months)
Location: Karachaganak Field, Aksai, Kazakhstan

KPO b.v. is JV between Shell, Chevron, and Eni with 450000 BOE production. Managed up to 30 contractors during preventive maintenance shutdowns Reviewed process and instrument diagrams. Conducted analysis of planned modification work packages. Supervised and prepared for planned maintenance turnovers (up to 30 contractors employees supervision) on Gas Processing facility. Solved facility operational problem for high H2S concentration oil and gas processes at Condensate Processing Plant, High-Pressure Gas Reinjection plant, Gas Processing facility; Improved equipment effectiveness and technological process control. Investigated equipment failure and production problems roots; Performed process simulation in HYSYS; Introduced new technologies trials (DRA trial for export pipelines).

Adil Doshayev's education
Texas A&M University - Mays Business School
Master of Business Administration - MBA
2020 - 2021
Harvard Business School Online
Certificate
2018 - 2019
Satbayev University
Bachelor's degree
2000 - 2005
Scrape emails from LinkedIn for free
20 free emails each month. No credit card required.
Regular search results
Search for leads on linkedin.com and scrape the search results
Sales Navigator search results
Search for leads in LinkedIn sales navigator and scrape the search results
Group members
Scrape members from any LinkedIn group without joining it
Event attendees
Scrape event attendees from any LinkedIn event
Directory