Fatima Ismaili Alaoui
About
Fatima Ismaili Alaoui is from Casablanca, Casablanca-Settat, Morocco. Fatima Ismaili works in the following industries: "Mechanical or Industrial Engineering". Fatima Ismaili is currently Directeur général at CIELEC, located in Bouskoura, Casablanca-Settat, Maroc. In Fatima Ismaili's previous role as a Directeur général adjoint at A3TEC, Fatima Ismaili worked in Bouskoura, Grand Casablanca, Morocco until Oct 2020. Prior to joining A3TEC, Fatima Ismaili was a CMMS «Computerized Maintenance Management System» team leader at SNCF and held the position of CMMS «Computerized Maintenance Management System» team leader at Technicentre sud est européen. Prior to that, Fatima Ismaili was a Methods and planning manager at SNCF, based in Technicentre sud est européen from Dec 2013 to Dec 2016. Fatima Ismaili started working as Methods and lean manufacturing project manager at SNCF in Technicentre sud est européen in Feb 2013. From Oct 2011 to Sep 2012, Fatima Ismaili was Trainee Project manager at SNCF, based in Saint pierre des corps. Prior to that, Fatima Ismaili was a Research and Development Engineer ( internship) at SNCF, based in Le mans from Sep 2011 to Oct 2011. Fatima Ismaili started working as Ingénieur méthodes at SNCF in Saint Pierre des Corps in Sep 2009.
You can find Fatima Ismaili Alaoui's email on finalScout.com. FinalScout is a popular professional database with more than 500 million business professionals and over 200 million company profiles.
Fatima Ismaili Alaoui's current jobs
CIELEC au service de l’industrie depuis 1979 évolue dans: - la vente - la conception - l’integration - la rénovation - la maintenance des systèmes industriels automatisés. Avec une forte expérience dans: - l'automatisme industriel - l'instrumentation - la régulation de procédés - la variation de vitesse Grâce à des partenariats engagés avec de nombreux fabricants européens : notre société est capable de prendre en charge vos projets industriels dans leur globalité en proposant le matériel le plus adapté à vos besoins et le plus fiable du marché.
Fatima Ismaili Alaoui's past jobs
National project set up a CMMS in order to standardize methods and procedures between the 35 SNCFmaintenance centers. - Responsible of the project management : change management, communication, deadlines - In charge of animating and piloting the monthly steering committee - Responsible of the respect of the project schedule (milestones) - In charge of the project reporting
(Fleet of 173 trainsets – team of 8 people) - In charge of the methods and planning team’s management, communication, control of the tasks performed and respect of the indicators : o Negociate and planify the yearly preventive maintenance workload that will be assigned to our maintenance center for the next coming year, o Carry out the yearly , quarterly and weekly preventive and curative maintenance task lists and maintenance plans o Study the weekly adequacy between load and manpower capacity - Conduct meetings (on a weekly and daily basis) with the maintenance operators to have a feedback about the work plans fulfilment using KPIs. - Manage continuous improvement projects - Update the technical documentation (maintenance standards , record sheets)
Project n°1: Improvement of the «DUPLEX» High-speed trains availability ---------------------------------------------------------------------------------------------------------- (Fleet of 80 trainsets- 3 maintenance teams – 250 maintenance operators) - Set up and follow up of the project action plans to improve the High-speed trains availability - Set up a dashboard and conduct the monthly steering committee >>>>Lean methods: Brainstorming -5W- Ishikawa –FMECA >>>>Achieved result of the project: Offering the availability of one more high speed train per day Project n°2: Decrease of the rail lines dedicated to prepare the high speed trains by 20% ------------------------------------------------------------------------------------------------------------------------------ (Fleet of 173 trainsets- 3 maintenance teams – 250 maintenance operators) - Ensure the fulfillment of the scheduled maintenance workload despite of the diminution of the rail lines capacity - Set up a dash board and conduct the monthly steering committee >>>>>Lean methods: DMAIC-VSM -Brainstorming - Ishikawa -FMECA-SIPOC
Set up an organization to prepare the construction of a new maintenance workshop dedicated to Level 2 and troubleshooting maintenance.
Innovate and propose solutions to optimize the European rail traffic management system (ERTMS) in snow covered areas.
Intitulé du sujet : ----------------- Analyse et résolution des problèmes générant de la maintenance corrective sur la fonction climatisation d'une série de TER Démarche utilisée : ----------------- 1. Quantification des taux d’incidents en ligne et du pourcentage de la maintenance corrective pour la fonction climatisation de la série. 2. Identification et analyse des causes générant une augmentation de ces taux. 3. Description et mise en place des solutions envisageables permettant l'optimisation des taux d'incidents en ligne et de la maintenance corrective. 4. Amélioration du plan de maintenance de la climatisation de la série. Résultats estimés : ----------------- Diminution du taux de la maintenance corrective de 20% : Gain de 2,4 jours en immobilisation. Diminution des fuites sur les groupes de 20% : Gain de 0,75 jours en immobilisation. Amélioration de la compétence d’analyse des agents de maintenance. Facilitation de l’exploitation du Retour d’Expérience pour le traitement des dysfonctionnements. ************************** Intitulé du sujet : ---------------- Réalisation et optimisation des plans de travaux pour la maintenance d'une série de Train Express Régionaux Démarche utilisée : ----------------- 1. Hiérarchisation des différentes opérations de maintenance préventives à effectuer sur la série grâce aux Inventaires de Travaux de Maintenance. 2. Enquête sur le terrain pour estimer le temps ainsi que les outils et installations nécessaires pour chaque opération. 3. Élaboration de plan de travaux à partir des données récoltées. 4. Validation du plan de travaux sur le terrain. Résultats atteints : ------------------ Les plans de travaux proposés sont opérationnels et exploitables.
Improvement of the current emergency repair team’s timetable adequacy between load and manpower capacity.
- Etude et utilisation du logiciel M-Graphics de Johnson Controls pour la GTC Gestion Technique Centralisée) - Installation d’une centrale d'alarme intrusion filaire.