Fred Valenzano is from Sparks, Nevada, United States. Fred works in the following industries: "Semiconductors", "Mechanical Or Industrial Engineering", "Design", "Utilities", "Construction", "Automotive", and "Civil Engineering". Fred is currently Senior Construction Project Manager at Tesla, located in Field . In Fred's previous role as a Design Manager at Tesla, Fred worked in Reno, Nevada Area until Aug 2020. Prior to joining Tesla, Fred was a Engineering Project Manager at IES and held the position of Engineering Project Manager at Bakersfield, California Area. Prior to that, Fred was a Sr. Project Manager at M+W Group, based in Bakersfield, California Area from Jul 2015 to Jun 2017. Fred started working as Project Manager at Stantec in Bakersfield, California in Oct 2014. From Apr 2013 to Sep 2014, Fred was Program Manager at Willbros, based in Bakersfield, California Area. Prior to that, Fred was a Sr. Construction Manager at AECOM, based in United States from Jun 2007 to Mar 2013. Fred started working as Project Manager at Processes Unlimited International Inc. in Bakersfield, California Area in Jun 2001.
If you’re looking for Fred Valenzano's email address, you can find it on finalscout.com. Finalscout is a professional database with more than 500 million business professionals and 200 million company profiles.
Fred Valenzano's current jobs
Fred Valenzano's past jobs
Led Engineering and Construction Management teams on fast-track projects for food and energy clients in all engineering disciplines. Started, picked up and completed oil processing facility engineering projects for several large and small clients. Completed over a dozen successful food projects, focusing on civil, mechanical, electrical, and safety.
EPC project manager for Redwood Solar, a 70 MW solar farm
Project Manager for OGX3 team servicing Oil and Gas clients.
Operations Manager for initial office startup in Bakersfield. Worked with internal team and consultants / agents to determine proposed office locations, requirements and negotiate costs. Developed estimated startup costs. Client Interface and business development, manage and prepare proposals. Manage multiple and wide variety of projects; oil, gas, power, industrial, utility. Led operations in Bakersfield, CA; including engineering and design. Recruit and recommend hiring of personnel. Work in startup environment Project Manager / Engineer for PG&E projects: Preliminary, detailed engineering for compressor station jacket water and fire detection upgrades, filter separator installation, ILI feasibility study. Energy clients: Conceptual engineering and estimating for gas storage energy recovery system; 115 kV oil field distribution power line; preliminary pipeline design for HDD under California Aqueduct, including CDWR permit package. Other clients: Preliminary engineering / estimate for water disposal evaporation pond cleanup system; production plant inlet water capture and separation expansion projects.
NAVFAC Southeast Building Integrated PV @ Navy facilities. Program Construction Manager for $100MM project installed 7.2 MW solar PV: 30 facilities at 19 sites. 4.7 MW BIPV, 2.5 MW ground-mount & parking canopy. 15 subcontractors / sub-consultants and 3 NAVFAC groups. Construction team staff > 30. Found site CMs; Prep site safety/work plans; Prep docs for / oversaw const. bid, select, contract. Field supv. contractors from kickoff to demobe. New York Power Authority Project, on-site Const. PM for Brooklyn Central Public Library Chiller Replacement. Fast-track $4.5MM energy efficiency project: chillers, circ./cooling tower and large electrical equipment while library was operating in summer. 10 separate subs, interface with union and non-union labor, local non-profit, city, state and permitting. Field supv. contractors from kickoff through demobe. On-site Construction PM for multiple SFSU projects. Controls Upgrade. 2.5MM project in 4 bldgs: digital control upgrades, install control modules, dampers VFDs for certain fans. $3.5MM Gymnasium project: Install 5 new HV units and rehab 7 old, digital controls on hot water systems, new HHW heat exchangers, replace steam heating loops. ICLS Lighting Installation. Developed Investment Grade Audits, Requests for Proposal, and review of bidding / recommendations; direct field supervision of contractors during all phases of construction from kickoff through closeout and demobe; coordination with multiple prime and sub-contractors and interfaces with union and non-union labor, Campus and state-wide California State University clients, local city and state permitting entities.
Managed engineering projects for various clients, focusing on power and general industry. Worked as cogeneration project engineer under contract to Chevron Production
Gas pipeline and mechanical systems engineer. Lead design efforts. Scoped, estimated, and lead projects
Office Manager of Quality Assurance Program. Lead all aspects of ISO 9001 compliance, including performing internal and responding to external audits
Operator / Mechanic for 300 MW Gas Turbine power stations with once-through HRSG supplying steam for enhanced oil recovery. Advanced from outside to inside (Control) operator. Participated in unit maintenance and emergency repair outages, punchout and startup of 300 MW Sycamore Cogeneration and 42 MW Mid-Set Cogeneration facilities. Wrote operating instructions, policies and procedures