Octavio J Urdaneta
About
Octavio works in the following industries: "Oil & Energy", and "Animation". In Octavio's previous role as a Petroleum Engineering Consultant at Analift, LLC, Octavio worked in Pembroke Pines, FL until Mar 2020. Prior to joining Analift, LLC, Octavio was a Production Manager - Sabanero field, Colombia at Metapetroleum Corp (MPC) and held the position of Production Manager - Sabanero field, Colombia at Bogotá D.C. Area, Colombia. Prior to that, Octavio was a Production Engineering Manager at Pacific Stratus Energy Ltd. (PSE), based in Bogotá D.C. Area, Colombia from Nov 2008 to Jun 2013. Octavio started working as Sr. Production Productivity & Artificial Lift Independent Consultant at Freelance, self-employed in Colombia and Mexico in Apr 2003. From Jan 2001 to Mar 2003, Octavio was Sr. Production Operation Advisor at Tia Juana Unit & Steam Injection Pilot Project Leader at PDVSA Petróleos de Venezuela S.A., based in Maracaibo, Venezuela. Prior to that, Octavio was a Themal Recovery Specialist 1 at INTEVEP, based in Los Teques, Venezuela from Sep 1999 to Dec 2000. Octavio started working as Field Development Manager & QQ Asset Manager at Quiriquire Field at Repsol - YPF (former YPF-Maxus Energy) in Maturin, Venezuela in Aug 1997.
Octavio J Urdaneta's email is available on Finalscout.com free of charge. This database has a wealth of information on over half a billion business professionals and two hundred million companies.
Octavio J Urdaneta's past jobs
Provide professional consulting services for the Oil & Gas industry in Latino America in the areas of: Reservoir, Geology, Petrophysics, Production Technology & Engineering, Operation Processes and reducing operational costs. Optimization of well production and artificial lifting systems. Advice on improved oil recovery projects.
Developded several project to optimize Oil & Gas Production in fields of: Pacific Rubiales Energy Corp. (PRE) in Colombia (Inland), Upstream Downstream simulation services, INC (UDSS, Inc) – (Offshore), D.S. Servicios Petroleros (Inland), CBM-Copyr S.A. de C.V ( Inland & Offshore) in Mexico.
Member of "The Excellent Center Unit" to support and advise Operational and Petroleum Enginnering Departments to increase Oil and Gas production and reduce deferred production in order to reduce the operating costs. - Lead teams of production engineers by mentoring and providing guidance. - Identify, develop and source the technologies required to meet the challenges of the company’s project portfolio, as well as evaluate, implement and deploy new technology, recommending of those that warrant testing and development within the company. - Manage multiple tasks simultaneously and foster teamwork and collaboration. - Coordinate the actions required to recover lost or deferred production to increase and optimize oil & gas production ensuring technical quality and cost effectiveness of the solution adopted. - Ensure that the company priorities are maintained on efficiently executing the R&M (Repair and Maintenance) components within the base production through the application of correct engineering analysis and costs control. - Responsible for the development and implementation of the steam drive at W-6 block project in Lagunillas field - Tía Juana District - Venezuela, , inland.
Leader for technical and scientific support and research for the application and development of candidate areas where continuous steam injection should be applied to increase the recovery of heavy oil areas
- Responsible for guaranteeing the development, operation and production of Quiriquire Block/Field
Responsible for the production, production optimization, design and re-design of artificial lift systems, well services and workover’s designs and planning, elaborations of programs and planning of all operational and services rig activities, thermal operation and steam injection plan in about 1,500 well/year (cyclic steam injection) and activities in heavy & extra heavy crude oil areas with about 6,200 wells (4 oil fields with 56 batteries, 5 Steam Injection Plants, and 32 WS Rigs, 6 WO rigs and 8 Drilling Rigs) producing from 260,000 to 310,000 stb/day. Achievement: - Increasing of 52,000 stb/day oil production of Costa Bolivar fields in a period of 7 months. (Feb. 1996). Previous Positions in Venezuela at Maraven, S.A.: - Development & Reservoir Engineer of Western Coast of Maracaibo Lake (Cretaceous reservoirs) - Inland & Maracaibo Lake. - Head of production Operational Programming – Maracaibo Lake. - Head of Reservoir and Production Eng. Department at Northern Bolivar Coast. – Inland. - Supervisor of Drilling and Wells Completion - inland. - Thermal Recovery Coordinator – Inland. - Supervisor of Production Analyst Engineers – Inland. - Production Engineer and Operational Programmer of Western Coast of Maracaibo Lake – Inland.