Rafael Villarreal
About
Rafael Villarreal is from Cypress, Texas, United States. Rafael works in the following industries: "Civil Engineering". Rafael is currently High School Engineering Teacher at Katy ISD - Cinco Ranch High School. In Rafael's previous role as a Math Teacher at Cypress-Fairbanks ISD, Rafael worked in until Aug 2014. Prior to joining Cypress-Fairbanks ISD, Rafael was a Project Manager at Huitt-Zollars, Inc. and held the position of Project Manager at Houston, Texas Area. Prior to that, Rafael was a Project Manager at CP&Y, Inc., based in Houston, Texas Area from Aug 2007 to Oct 2008. Rafael started working as Project Engineer at BGE, Inc. in Houston, Texas Area in Jun 1999. From May 1986 to Aug 1994, Rafael was Electrical Powerline Specialist, Staff Sergeant at United States Air Force.
Go to finalscout.com and type Rafael Villarreal's name into the search box for a free email address. FinalScout is a professional database with more than 500 million business professionals and 200 million company executives.
Rafael Villarreal's current jobs
Principles of Applied Engineering Engineering Design & Presentation Engineering Science Engineering Design & Problem-Solving
Rafael Villarreal's past jobs
Algebra I & II Geometry Pre-Calculus Calculus
• Managed all aspects of project operations including schedule, budget and work progress for the Fort Bliss Expansion Project in El Paso, Texas for the Army Corps of Engineers. Efficiently managed a budget of over $1.5 million dollars under critical time constraints resulting in $400,000 savings. • Responsible for electrical and illumination design for base housing and maintenance facilities for the Fort Bliss Expansion Project in El Paso, Texas for the Army Corps of Engineers. Performed illumination layout design, electrical circuit design, and voltage drop calculations using Autocadd, MicroStation, and Visual lighting programs. • Led project team for developing electrical and lighting construction plans for the Love Field Modnerization Program in Dallas, Texas. Designed exterior parking lot and roadway lighting for 400,000 square feet of paved surface using Autocadd and Visual Lighting programs. Coordinated with local utility providers for location, type, and size of power service sources. • Developed lighting and electrical plans for two miles of roadway, and six station platforms for the downtown Rusk and Capitol Street corridors of the Houston Metro Light Rail system using MicroStation and Visual Lighting programs. Designed pole foundation supports for street light poles and decorative architectural lighting poles.
• Designed Commonwealth Blvd bridge illumination for the City of Sugar Land, Texas. Responsible for illumination layout design, electrical circuit design, voltage drop and illuminance calculations, and low voltage overhead power source for overhead architectural bridge lighting.
• Led project team for speed zone analysis of 98 miles of Texas highways for the Texas Department of Transportation Pharr District. Efficiently managed a $130k budget resulting in 52% profit margin. Created contract documents, manhour and material cost estimates, and work schedules. Conducted and supervised work review meetings with clients at 30%, 60%, and 90% review stages. • Managed contracts for three Texas Department of Transportation districts for traffic studies reports. Managed multiple budgets of $50k producing traffic studies analysis reports for 200 intersections for the Houston, Pharr, and Lufkin TXDOT districts. Created contract documents, manhour and material cost estimates, and work schedules. • Performed annual employee performance evaluations for four employees over a three year period from 2003-2006. • Developed and maintained client relationships by consistently completing projects on time, under budget, and with high quality resulting in acquisition of future work from several TXDOT districts. • Responsible for roadway illumination design of six miles of main lanes on the Fort Bend Westpark Tollway in Fort Bend County, Texas, including underpass lighting for the State Highway 99 interchange. Performed illumination layout design, electrical circuit design, and voltage drop calculations using MicroStation. Designed location size and type of overhead and underground electrical power sources. • Responsible for design of roadway lighting for over five miles of main lane highway on US 67 in Tom Green County, including three underpasses and three overpass bridges for the TXDOT San Angelo District. Performed illumination layout design, electrical circuit design, and voltage drop calculations using MicroStation. Designed location size and type of overhead and underground electrical power sources.
• Trained and motivated Air Force recruits in technical skills, regulations, and military bearing to become effective enlisted personnel while serving as a Non Commissioned Officer. • Led teams of 7-10 junior enlisted personnel on construction and maintenance of high and medium voltage overhead and underground electrical systems for base buildings and facilities. • Conducted annual Enlisted Performance reviews for 7-10 junior enlisted personnel and made recommendations for improvements and rank advancements.