Salvador Aguilar
About
Salvador Aguilar is from Mexico. Salvador is currently Injection Molding & Industrialization Manager at SARREL, located in Guanajuato, Mexico. In Salvador's previous role as a Injection Molding Manager at Glasser, S.A. de C.V., Salvador worked in Querétaro, Mexico until Jan 2018. Prior to joining Glasser, S.A. de C.V., Salvador was a Injection Molding Department Head at Saint-Gobain and held the position of Injection Molding Department Head at Querétaro, Mexico. Prior to that, Salvador was a Injection Process & Tooling Department Head at Saint-Gobain, based in Querétaro, Mexico from Jan 2012 to Jan 2014. Salvador started working as Maintenance & Industrial Process Department Head at Saint-Gobain in Querétaro, Mexico in Jan 2009. From Jan 2008 to Jan 2009, Salvador was Methods & Process Engineer at Saint-Gobain, based in Querétaro, Mexico. Prior to that, Salvador was a Injection Process Engineer at Automotive Lighting, based in Querétaro, Mexico from Jan 2005 to Jan 2008. Salvador started working as Injection Molding Supervisor at Automotive Lighting in Querétaro Arteaga, México in Jan 2001.
You can find Salvador Aguilar's email on finalScout.com. FinalScout is a popular professional database with more than 500 million business professionals and over 200 million company profiles.
Salvador Aguilar's current jobs
Built the injection area from an empty facility into a certified automotive operation under IATF 16949 — CAPEX >USD 2M, 12 automated lines, 70+ molds industrialized, programs for BMW, Audi, Volkswagen, and Nissan. Key results: Launched 20 automotive molds during COVID-19, absorbing 3–4 months of delays. two-shot lines at 100% capacity from SOP with ~4.8% scrap. Resolved critical chrome-plating defect on Mercedes-Benz front grille: scrap 50% → 8% in 10 weeks. Diagnosed a Nissan supply crisis — identified the real constraint in the system. Raised injection OEE to ~95% and scrap to <3%, eliminating injection-side variables that freed the chrome team to reduce their scrap from 50–60% to 18–20%. Built internal mold shop from scratch: maintenance costs down >30%, OEE impact from mold failures 5.0% → 2.3%. Developed 12 engineers from entry level. Average tenure: 6 years. 6 of 10 key positions filled through internal promotion.
Salvador Aguilar's past jobs
Managed operations across 13 injection molding machines and 7 assembly lines, leading a team of 150+ employees in a fast-paced production environment. Key results: Led organizational redesign replacing dysfunctional shared supervision with an internally promoted frontline leadership model. Scrap: 9,000 ppm → 4,700 ppm. Plan attainment: 91% → 94% within the first year. Improved operational efficiency by 30% and productivity by 20% on assembly lines through line balancing.
Seven-year progression to full area responsibility at a high-volume manufacturing plant producing refrigerator grilles for Whirlpool, Mabe, and Samsung. Key Results: Took full responsibility over the injection area: 10 machines, production, processes, and mold maintenance, leading a team of 80 people. Implemented a pigment consumption control system — daily conciliation, standardized dosing parameters — corrected >USD 14K/month in financial deviation.
Led technical teams in troubleshooting and root cause analysis to improve process reliability and production stability. Key Results: Developed process standards and operational discipline that reduced variability: scrap reduced from 15,000 ppm to 11,000 ppm within one year. Supported a plant-wide workforce retention initiative led by HR — contributed to identifying critical operations, defining required skill sets, and developing training materials and evaluations for operators and process technicians. Retention rate: >80%.
Built and led a technical maintenance and process team with a strong focus on internal self-sufficiency. Key Results: Coordinated the complete relocation of the injection molding operation to a new facility (10 presses, 40–50 molds, and ~7.5 million annual units) ensuring full production continuity without a single delivery interruption. Managed preventive and corrective maintenance across 10 injection machines and 40–50 molds in a high-volume manufacturing environment.
Developed standardized parameter sheets as the technical management baseline for the area. Key Results: Implemented scientific molding methodology across 10 lines and ~40 molds — cycle time reductions of up to 35% on critical parts (75 s → 52–56 s). Released capacity equivalent to ~1M additional units/year with no capital investment in machinery. Eliminated in-field part failures from fracture through holding parameter correction — from recurring customer complaints to zero incidents.
Career foundation at a Tier 1 automotive lighting plant supplying GM, Ford, Toyota, and Volkswagen. Built core expertise in injection processes, molds, and automotive quality systems.