WS

Wajahat Siddique

Project Management | Process Management | SAM (PM Module) | Energy Audit | Business Diversification | PPA | Technical Trainer | Engineering Strategies
Request removal
Email: ****t@hotmail.com
LinkedIn: Wajahat Siddique
Location: 巴基斯坦 信德省 卡拉奇
Current title:
Deputy Manager
Last updated: 21/05/2023 23:47 PM
Get valid emails for Wajahat and 500M other professionals
20 free emails each month. No credit card required.
500M
Business Profiles
20M
Company Profiles
200M
Email addresses
98%+
Email Delivery
About

Wajahat Siddique is from 巴基斯坦 信德省 卡拉奇. Wajahat works in the following industries: "石油和能源". Wajahat is currently Deputy Manager at FPCL (FFBL Power Company Limited), located in Karāchi, Sindh, Pakistan. Wajahat also works as Electrical Lead at FPCL (FFBL Power Company Limited), a job Wajahat has held since Feb 2017. In Wajahat's previous role as a Design | Testing & Commissioning Lead at FPCL (FFBL Power Company Limited), Wajahat worked in Karāchi, Sindh, Pakistan until Feb 2017. Prior to joining FPCL (FFBL Power Company Limited), Wajahat was a Assistant Manager Electrical at Gul Ahmed Energy Limited and held the position of Assistant Manager Electrical at Karachi, Pakistan. Prior to that, Wajahat was a Assistant Shift Engineer at Gul Ahmed Energy Limited, based in karachi from Jan 2012 to Dec 2012. Wajahat started working as Electrical Trainee Engineer at Gul Ahmed Energy Limited in Karāchi, Sindh, Pakistan in Mar 2011. From Dec 2009 to Dec 2009, Wajahat was Internee at SIEMENS Pakistan. Engg. Co. Ltd. Prior to that, Wajahat was a Internee at PIA Engineering, Karachi, based in Karachi, Pakistan. from Jun 2009 to Jul 2009.

Wajahat Siddique's email is available on Finalscout.com free of charge. This database has a wealth of information on over half a billion business professionals and two hundred million companies.

Wajahat Siddique's current jobs
Title: Deputy Manager
Period: Mar 2021 - Present (5 years)
Location: Karāchi, Sindh, Pakistan

Energy Audit | Power Purchase Agreement | Business Development | External Services | Organization diversification

Title: Electrical Lead
Period: Feb 2017 - Present (9 years, 1 month)
Location: Karāchi, Sindh, Pakistan

FFBL(Fauji Fertilizer Bin Qasim Limited) has enhanced its generation capacity through installation of 118MW coal based power plant. Generating power at 60Hz for process plant and 50Hz for power export to K-Electric. Project has successfully implemented on EPCM approach. Major packages are Boiler units, Steam turbine generators; Conveyor based solid handling system for Coal/ Ash, Balance of plant (BOP) for interconnection of all packages and 132KV power export unit. Plant is now operational after successful erection and commissioning. 𝘌𝘹𝘦𝘤𝘶𝘵𝘦 𝘱𝘭𝘢𝘯𝘵 𝘥𝘢𝘺 𝘵𝘰 𝘥𝘢𝘺 𝘱𝘳𝘦𝘷𝘦𝘯𝘵𝘪𝘷𝘦 𝘢𝘯𝘥 𝘤𝘰𝘳𝘳𝘦𝘤𝘵𝘪𝘷𝘦 𝘮𝘢𝘪𝘯𝘵𝘦𝘯𝘢𝘯𝘤𝘦𝘴 𝘌𝘯𝘴𝘶𝘳𝘦 𝘸𝘰𝘳𝘬 𝘱𝘦𝘳𝘮𝘪𝘵, 𝘭𝘰𝘨 𝘰𝘶𝘵 𝘵𝘢𝘨 𝘰𝘶𝘵, 𝘴𝘰𝘱𝘴 & 𝘸𝘰𝘳𝘬 𝘱𝘳𝘰𝘤𝘦𝘥𝘶𝘳𝘦 𝘤𝘰𝘮𝘱𝘭𝘪𝘢𝘯𝘤𝘦 𝘚𝘢𝘱 𝘶𝘴𝘢𝘨𝘦 𝘧𝘢𝘤𝘵𝘰𝘳 𝘪𝘮𝘱𝘭𝘦𝘮𝘦𝘯𝘵𝘢𝘵𝘪𝘰𝘯 𝘧𝘰𝘳 𝘱𝘭𝘢𝘯𝘵 𝘮𝘢𝘪𝘯𝘵𝘦𝘯𝘢𝘯𝘤𝘦 𝘮𝘰𝘥𝘶𝘭𝘦 𝘐𝘯𝘪𝘵𝘪𝘢𝘵𝘪𝘰𝘯 𝘰𝘧 𝘫𝘰𝘣 𝘴𝘢𝘧𝘦𝘵𝘺 𝘢𝘯𝘢𝘭𝘺𝘴𝘪𝘴 𝘳𝘦𝘱𝘰𝘳𝘵 𝘧𝘰𝘳 𝘮𝘢𝘪𝘯𝘵𝘦𝘯𝘢𝘯𝘤𝘦 𝘢𝘤𝘵𝘪𝘷𝘪𝘵𝘪𝘦𝘴 𝘙𝘰𝘰𝘵 𝘤𝘢𝘶𝘴𝘦 𝘢𝘯𝘢𝘭𝘺𝘴𝘪𝘴 𝘧𝘰𝘳 𝘥𝘪𝘴𝘤𝘳𝘦𝘱𝘢𝘯𝘵 𝘦𝘷𝘦𝘯𝘵𝘴 𝘢𝘵 𝘴𝘪𝘵𝘦 𝘸𝘪𝘵𝘩 𝘥𝘰𝘤𝘶𝘮𝘦𝘯𝘵𝘢𝘵𝘪𝘰𝘯 𝘪𝘯 𝘱𝘭𝘢𝘯𝘵 𝘱𝘳𝘰𝘣𝘭𝘦𝘮 𝘳𝘦𝘨𝘪𝘴𝘵𝘦𝘳 & 𝘳𝘦𝘱𝘰𝘳𝘵 𝘪𝘯𝘪𝘵𝘪𝘢𝘵𝘪𝘰𝘯𝘴. 𝘛𝘶𝘳𝘯 𝘢𝘳𝘰𝘶𝘯𝘥 𝘱𝘭𝘢𝘯𝘯𝘪𝘯𝘨 𝘪𝘯𝘤𝘭𝘶𝘥𝘪𝘯𝘨 𝘮𝘢𝘵𝘦𝘳𝘪𝘢𝘭, 𝘫𝘰𝘣 𝘴𝘤𝘰𝘱𝘦, 𝘖𝘌𝘔 𝘦𝘹𝘱𝘦𝘳𝘵 𝘳𝘦𝘲𝘶𝘪𝘳𝘦𝘮𝘦𝘯𝘵𝘴, 𝘸𝘰𝘳𝘬 𝘧𝘰𝘳𝘤𝘦 𝘪𝘯𝘥𝘶𝘤𝘵𝘪𝘰𝘯 𝘢𝘯𝘥 𝘦𝘹𝘦𝘤𝘶𝘵𝘪𝘰𝘯. 𝘋𝘦𝘱𝘢𝘳𝘵𝘮𝘦𝘯𝘵 𝘚𝘢𝘧𝘦𝘵𝘺, 𝘐𝘯𝘷𝘦𝘯𝘵𝘰𝘳𝘺 & 𝘚𝘈𝘗 𝘪𝘮𝘱𝘭𝘦𝘮𝘦𝘯𝘵𝘢𝘵𝘪𝘰𝘯 𝘵𝘦𝘢𝘮 𝘤𝘰𝘰𝘳𝘥𝘪𝘯𝘢𝘵𝘰𝘳.

Wajahat Siddique's past jobs
Title: Design | Testing & Commissioning Lead
Period: Dec 2015 - Feb 2017 (1 year, 2 months)
Location: Karāchi, Sindh, Pakistan

Joind FFBL Power Company Limited during Design and Construction Phase and carried out procurement, Design Reviews, Execution & Commissioning successfully with following major key mile stones. * MV and LV switch gears ABB (CZ Republic) and Schneider (Indonesia) respectively * MV (6.6 KV) and LV motors SULZER, HHI, WEG, ABB. * ABB & Alstom transformers up to 80 MVA * 60 MW power export turbine in coordination with corresponding Vendor Commissioning Engineers which mainly includes, GE Multilin Protection Relays (G60), GE LV Switch Gear, ABB Unitrol excitation control system, TEMEC Alternator, Electrical Control Logic Review for DCS including Protection Coordination. * Review Electrical SLDs, Plant Earthing System & Site Modification initiating Technical Clarifications with * OEM, Project Consultant and Execution Contractor * Electrical site In-charge for all executional activities, Manpower handling & project time lines tracking. * Erection and Commissioning of Gas Insulated System Alstom F35 Double Bus Bar | AIS System for Power Export Scope for FPCL Project.

Company: Gul Ahmed Energy Limited
Title: Assistant Manager Electrical
Period: Jan 2013 - Dec 2015 (2 years, 11 months)
Location: Karachi, Pakistan

Operations, Planning, Maintenance & Co-ordination: Assisting Operation Manager (WPK), Manager Generation (GAEL) for safe and smooth operation with optimum KPIs. Investigate plant deviations from operation standards maintaining optimal performance. Manage Plant Shift Operations and Manpower Handling. Preparation of comprehensive daily, monthly and annual reports for plant KPIs. Ensure implementation of PPA (power purchase agreement) with K-Electric, FSA (Fuel Supply Agreement) with Pakistan State Oil and O&M (operation and maintenance agreement) with Wartsila Pakistan. Develop SOPs (standard operating instructions & procedures), troubleshooting procedures. Prepare day to day job plans including participation and reporting on new projects and modifications on site. Data Recording and Reports Generation on Computerized Maintenance Management System Software (CMMS). Maintenance and testing of Generators, Motors, Protection Relays, LV, MV and HV Equipment. Planning and execution of Generator Preventive Maintenance based on running hours and break down history. Take up the issues with manufacturers for recommendations on repeated failures, guidance and information. Preparation and carrying out annual performance/ reliability tests of plant in presence of K-Electric personal.

Company: Gul Ahmed Energy Limited
Title: Assistant Shift Engineer
Period: Jan 2012 - Dec 2012 (11 months)
Location: karachi

My fast learning progress and satisfactory performance against all assigned tasks. I was promoted as Assistant Engineer Electrical in less than one year. Despite the standard trainee engineer period was about 1.5 years. On this promotion I was assigned responsibility for Rotating Shit Engineer Electrical and Instrumentation. My core responsibility as Shift In charge was to ensure smooth plant operation through troubleshooting, monitoring plants key performance indicators, execute control room operations in liaison with central control room of the utility company. Apart of handling my shift duties I took keen interest to review plant safety protocols and also refined them after getting approval from the management.

Company: Gul Ahmed Energy Limited
Title: Electrical Trainee Engineer
Period: Mar 2011 - Dec 2011 (9 months)
Location: Karāchi, Sindh, Pakistan

As Trainee Engineer Operation I use to document Standard Operating Procedure for the maintenance and operation activities. I also submitted numerous observations in the procedures which led towards improvisation in them. * Logging Plant KPIs. * Maintenance Activities on Generators | Motors | Switchgears. * Safety Protocol and review of Work Safety and LOTO procedures. * Report compilation for Plant Fuel and Lube Oil consumptions. * Programming of AVRs and PLCs logic on Warsila WOIS System

Company: SIEMENS Pakistan. Engg. Co. Ltd
Title: Internee
Period: Dec 2009 - Dec 2009

Learned about different types of switch gear panels, capacitor banks, SF6 circuit breakers and reading of electrical drawings and layouts. Visited various departments in the organization and learned its way of working.

Company: PIA Engineering, Karachi
Title: Internee
Period: Jun 2009 - Jul 2009 (1 month)
Location: Karachi, Pakistan.

learned about turbines, electrical gadgets that are related to aircraft.

Wajahat Siddique's education
BE
2006 - 2010
NED University of Engineering and Technology
Master's Degree
2014 - 2018
Adamjee Govt. Science College, Karachi
HSC
2004 - 2006
Wajahat Siddique's top skills
Engineering Basic Photoshop Turbines MS Office Suite Troubleshooting Hardware Transformer Microsoft Office Instrumentation C C Language Matlab Inspection Power Plants Troubleshooting Generators Factory PLC Multisim MPLAB Relays
Other people named Wajahat Siddique
WS
Wajahat Siddique
Deputy Assignment Editor
WS
Wajahat Siddique
Multi Role Management Professional & Critical Analyst
W(
Wajahat Siddique (ACA)
Audit Manager
Karāchi, Sindh, Pakistan
WS
Wajahat Siddique
CEO Rajpoot Real Estate and Builders
WS
Wajahat Siddique
BDR
San Francisco, California, United States
There are 8 other "Wajahat Siddique". You can find all of them in FinalScout.
Find emails from LinkedIn for free
20 free emails each month. No credit card required.
Regular search results
Search for leads on linkedin.com and scrape the search results
Sales Navigator search results
Search for leads in LinkedIn sales navigator and scrape the search results
Group members
Scrape members from any LinkedIn group without joining it
Event attendees
Scrape event attendees from any LinkedIn event
Directory